Commit6465da8(phase 04-01 executor) was made from a stale worktree predating v1.0 completion (ee686a3), accidentally reverting: - ROADMAP.md from v2.0 (phases 4-7) back to pre-v1.0 structure - STATE.md from milestone v2.0/active back to v1.0/executing - Deleted .planning/milestones/ (v1.0 archive files) This commit restores the correct state: - ROADMAP.md: v2.0 structure with v1.0 archived + phase 04 marked complete - STATE.md: milestone v2.0, phase 04 complete (1/4 phases, 25%) - milestones/: v1.0-ROADMAP.md + v1.0-REQUIREMENTS.md restored - MILESTONES.md + RETROSPECTIVE.md: restored from v1.0 completion - phases/01-03/: staged deletions of v1.0 phase artifacts (cleaned up) - v1.0-MILESTONE-AUDIT.md: audit report documenting the corruption Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
8 KiB
| milestone | audited | status | scores | gaps | tech_debt | nyquist | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| v1.0 | 2026-04-10T12:40:45Z | gaps_found |
|
|
|
|
Milestone Audit: claudebox (v1.0 per STATE.md / v2.0 actual)
Audited: 2026-04-10 Status: gaps_found — critical planning artifact corruption detected Phase under audit: 04-auth-passthrough (only on-disk phase)
⚠ Critical Finding: Planning Artifact Corruption
The GSD tooling believes the current milestone is v1.0, but v1.0 was already completed at commit ee686a3 (2026-04-10). The actual current milestone is v2.0 Network Isolation & Profiles (phases 04–07).
What Happened
Commit 6465da8 feat(04-01): add credential file mount for OAuth passthrough (the phase 04 executor agent commit) was made from a worktree that predated the v1.0 completion commit (ee686a3). This caused three regressions:
| Artifact | Expected (after v2.0 start) | Actual at HEAD | Commit that broke it |
|---|---|---|---|
ROADMAP.md |
v2.0 structure — ✅ v1.0 archived, phases 4-7 in progress | Pre-v1.0 structure — phases 1-3, two marked incomplete | 6465da8 |
STATE.md |
milestone: v2.0, status: active |
milestone: v1.0, status: executing |
6465da8 |
.planning/milestones/ |
v1.0-ROADMAP.md, v1.0-REQUIREMENTS.md, MILESTONES.md, RETROSPECTIVE.md | Directory missing from disk | 6465da8 |
Recovery Path
# Restore correct planning state from the v2.0 roadmap commit
git checkout 4852696 -- .planning/ROADMAP.md .planning/STATE.md
git checkout ee686a3 -- .planning/milestones/ .planning/MILESTONES.md .planning/RETROSPECTIVE.md
# Then update STATE.md to reflect phase 04 completion and commit
Phase Audit: 04-auth-passthrough
Verification Status
| Phase | VERIFICATION.md | Score | Status |
|---|---|---|---|
| 04-auth-passthrough | ✅ Present | 7/7 | passed |
Requirements Coverage (3-Source Cross-Reference)
| REQ-ID | Description | VERIFICATION.md | SUMMARY frontmatter | REQUIREMENTS.md | Final Status |
|---|---|---|---|---|---|
| AUTH-01 | ~/.claudebox/.credentials.json bind-mounted read-write when file exists |
SATISFIED | not present | Complete |
satisfied |
| AUTH-02 | Silent skip when credentials file absent | SATISFIED | not present | Complete |
satisfied |
Note: SUMMARY.md frontmatter does not include a requirements_completed field. Both requirements are confirmed satisfied via VERIFICATION.md evidence and REQUIREMENTS.md traceability.
Orphan Detection
No orphaned requirements. AUTH-01 and AUTH-02 are the only v2.0 phase 04 requirements; both appear in VERIFICATION.md and REQUIREMENTS.md traceability.
Integration Check Results (gsd-integration-checker)
All 5 integration checks PASS:
| Check | Result | Notes |
|---|---|---|
| BWRAP_ARGS array used in exec bwrap | PASS | Line 401: exec bwrap "${BWRAP_ARGS[@]}" — correct quoting and [@] |
| print_audit() shows credential when CREDS_MOUNT=true | PASS | Lines 281-283: conditional present and wired |
| --dry-run mirrors credential bind | PASS | Lines 353-355: same guard and --bind flag |
| Pre-existing v1.0 mounts intact | PASS | All 10 mount categories verified present in BWRAP_ARGS |
| SKIP_AUDIT / --yes flag interaction | PASS | print_audit inside [[ "$SKIP_AUDIT" != true && "$DRY_RUN" != true ]] at line 293 |
Non-blocking integration gap: dry-run block (lines 333-360) is a hardcoded reproduction of the exec path, not derived from BWRAP_ARGS. Maintenance hazard — future mounts must be manually mirrored. No current requirement violated.
Requirements Integration Map
| Requirement | Integration Path | Status |
|---|---|---|
| AUTH-01 | CREDS_FILE→CREDS_MOUNT=true→BWRAP_ARGS+=--bind→exec bwrap; mirrored in print_audit() and dry-run |
WIRED |
| AUTH-02 | [[ -f "$CREDS_FILE" ]] || CREDS_MOUNT=false→all consumers gate on CREDS_MOUNT==true→no bind emitted |
WIRED |
Tech Debt Inventory
| Phase | Item | Severity |
|---|---|---|
| 04 | dry-run block is hardcoded parallel to BWRAP_ARGS — maintenance hazard | low |
| 04 | export SKIP_AUDIT # consumed by Plan 02 audit display — stale comment, dead export |
cosmetic |
| 04 | Network: full (host network) in print_audit — intentional Phase 06 placeholder |
intentional |
Nyquist Compliance
Skipped — workflow.nyquist_validation: false in config.json.
Milestone Completeness Assessment
The actual milestone is v2.0 Network Isolation & Profiles. Current state:
| Phase | Name | Status |
|---|---|---|
| 04 | Auth Passthrough | ✅ Complete (verified) |
| 05 | Per-Project Instance Isolation | ❌ Not started |
| 06 | Tiered Network Isolation | ❌ Not started |
| 07 | Named Profiles | ❌ Not started |
v2.0 is 25% complete (1/4 phases). Do not complete the milestone yet.
Summary
Phase 04 (auth-passthrough) is solid: all requirements satisfied, integration clean, no blocking issues.
The milestone should not be completed because:
- STATE.md and ROADMAP.md are corrupted artifacts from a bad executor commit — they must be restored
- v2.0 has 3 remaining phases (05-07) yet to be executed
- v1.0 was already completed at
ee686a3— completing it again would duplicate the archive
Required action before any milestone completion:
- Restore correct ROADMAP.md and STATE.md from git history (see Recovery Path above)
- Restore
.planning/milestones/fromee686a3 - Continue v2.0 development with phase 05
Audited: 2026-04-10 Auditor: Claude (gsd-audit-milestone)